
Due to the terraced nature of the building site, the construction of a solid base was required
to ensure that the building floor be level. The accompanying drawing markes the placement of the
supporting posts for the shed's base and the roll-off roof structure. The arrow points at the
hole for the concrete foundation of the steel pier.